SettleJoy安喜鑰

New home handover checklist (snagging list)

Before you accept the keys to a new home, check every room, list each defect with its location, and give the list to the developer with a repair deadline. Then tick items off at the follow-up visit.

Open the interactive checklist

No sign-up. Your notes stay on your device. Make the report in English or Chinese.

Download the printable PDF (A4, English + Chinese)

Before you start

  1. Bring your contract, floor plan and specification list.
  2. Pack a torch, a coin, a plug-in socket tester, tape measure, masking tape and a bucket.
  3. Go in daylight and allow at least two hours.
  4. Write each defect with room, position and size, e.g. “bedroom 1 window frame, bottom-left: sealant cracked ~10 cm”.
  5. Structure, waterproofing, wiring and gas need a qualified professional if you have doubts.

The checklist, room by room

Tick each item OK, issue or not applicable. Grey text explains how to check.

Entrance

Living / dining room

Bedroom (each)

Kitchen

Bathroom (each)

Balcony / utility area (each)

Whole home

Parking, storage & mailbox

Paperwork & handover

General checkpoints only — not a legal standard, a professional inspection or legal advice.

Open the interactive checklist

No sign-up. Your notes stay on your device. Make the report in English or Chinese.

Download the printable PDF (A4, English + Chinese)

Taiwan example: 5% handover retention

Under Taiwan's mandatory terms for pre-sale housing contracts (item 13), the seller must provide an inspection form, defects must be written on it and repaired within a set time, and the buyer may retain 5% of the total price until repairs pass a joint re-inspection. Other countries have different rules — check your contract.

Source: Taichung City Government consumer-protection page (Chinese) (checked 2026-11-06).

Questions

Should I hire a professional inspector?

This checklist helps you look carefully yourself. Whether to hire a professional depends on the home and your budget; hidden leaks, structure and wiring need instruments.

What if the developer disagrees that something is a defect?

Write it down anyway with photos and ask them to explain in writing. Your contract and local rules decide.

How do I track repairs?

In the interactive version, open the report after repairs and mark each item fixed or not fixed.

Other checklists